Now, when the dates are listed in both the “Post” and “Creative” sections of the “Production Schedule” in the CLP a visual indicator will be provided.
The indicator will appear under the following conditions:
- An entry changes from “No Date” to an actual date.
- An asset that is pending delivery has its expected date brought forward or pushed out.
- An asset is delivered and the expected date is updated with the date the delivery took place.
For episodic content the indicator will appear at both the individual episode level with an aggregated count displayed at the asset level.
The indicator will remain visible for 2 business days after a date change has been made.